Skip Navigation Links

Bioko island road rehabilitation and maintenance project

PN10055 | Project Completion Report Review Note | 31-Dec-2005





Download Report
Lesson(s)
 
1) Assistance in the preparation of the fulfilment of the loan conditions seems necessary in countries with limited human resources, in order to enable loan effectiveness within acceptable time frames; also a more thorough preparation of projects is indicated, and a special attention should be paid to the nature of loan effectiveness conditions and the timeframes required for their fulfilment


Ratings

Countrie(s):
Equatorial Guinea
Sector(s):
Transport
Project(s)
P-GQ-DB0-001




Attachment(s)  
Summary Report PN10055_SR_FR PN10055_SR_FR.pdf